Engineering

Print
Press Enter to show all options, press Tab go to next option
Contact
Lenor Bromberg
Lenor M. Bromberg
PE, AVS, LEED AP BD+C
City Engineer
Email Lenor Bromberg
Phone: 770-594-6196
Fax: 770-641-3741
Hours & Location
Monday - Friday
8:00 AM - 5:00 PM

Permit Intake Hours
8:30 AM - 4:30 PM

38 Hill Street
Suite G-30
Roswell, GA, 30075

Overview

The Engineering Division is responsible for overseeing land development and tree removal activities within the City of Roswell, including application and plan reviews, and site inspections.

Quick Links

generic horizontal rule


Responsibilities

  • Development Plan Review: The Plan Review staff provides plan reviews for land disturbance permits and coordination of the development permit process. Call the City Engineer at 770-594-6196 for more information.

  • Land Development Inspections: Engineering staff provides inspections for activities that require land disturbance permits from the Community Development Department.

  • Tree Removal Permits: A Tree Removal Permit, including a Tree Survey, Tree Protection Plan, Tree Replacement Plan, as applicable, is required for both commercial and residential projects if removal of trees greater than three inches in diameter or Specimen Trees, as defined in Article 12 of the Roswell Unified Development Code, is anticipated.

  • Erosion, Sedimentation and Pollution Control: As a Local Issuing Authority, the Engineering Division enforces the State construction general permit, and City Soil Erosion, Sedimentation and Pollution Control Ordinance.

  • Stream Buffers: Streams designated as State Waters are subject to State and/or City stream buffers based on the designated stream type. Alteration of these buffers is limited. Please contact the Engineering Division for more information on the required State and/or City buffers associated with your property or project.

  • Inspection and Plan Review Results: To obtain more information on the status of your Land Disturbance Permit application or inspection results, please contact the Permit Technician. It is helpful if you have your permit application number when calling or writing us for information. Online results are not available at this time.


generic horizontal rule


Staff






Applications, Checklists & Documents

Applications

Checklists

Documents