Eves Road Complete Street
Eves Rd at Autumn Ridge
This project will transform the Eves Road corridor into a Complete Street as defined by the City's Complete Streets policy.  A Complete Street uses a design approach that allows users of all ages, abilities, and modes of transportation to have equal access to the transportation corridor.  These users are more able to move along and across the street with fewer vehicle conflicts.  This project will provide:

  • Dedicated bicycle lanes
  • An 8-foot multi-use path along the east side of Eves Road
  • A sidewalk along the west side of Eves Road
  • Some traffic calming concepts
  • Sustainable stormwater design
  • Improved pedestrian crossings
  • Aesthetic improvements
  • Intersection improvements at Eves Circle/Eves Road and Riverside Road/Eves Road
  • A vehicular connection to East Roswell Park

The project is currently in construction procurement and is expected to begin construction in September 2014.  The project cost is $1.2 million and is part of the 2012 Roswell Bond Referendum.

Draft cross-sections of the corridor improvements are located here.
A draft concept for the East Roswell Park connection is located here.

For more information, contact the Roswell DOT by email or at 770.594.6420.



38 Hill Street, Roswell, GA 30075, 770-641-3727